HOME ABOUT US RESEARCH PUBLICATION RESOURCE ACTIVITY

 

Year 2011
Cui, Q., Zhu, X., Whitten, L. and Deane, R. (2011) "Innovative Contracting Strategies for Combating Climate Change—Final report". Report Prepared for Maryland State Highway Administration at the Center for Excellence in Project Management, University of Maryland. See Paper

Cui, Q., Sharma, D. and Farajian, M. (2011). “Feasibility Study Guideline for Public Private Partnership Projects: Vol I & II”, University Transportation Center for Alabama. See Paper

Cui, Q. and Zhu, X. (2011) “Green Contracting in Highway construction: State of Practice”. Transportation Research Record, Journal of the Transportation Research Board. (Accepted) See Paper

Cui. Q., Sharma. D. K. , Farajian. M., Lindly. J., and Jilla. R. (2011) "Feasibility Study Guidelines for Public Private Partnership Procurement on Highway Projects". 90th TRB Annual Conference, Washington DC. See Paper

Farajian, M. and Cui, Q. (2011). “A Multi-Objective Decision Support System to enhance Public Private Partnership (PPP) funding strategies ”, 2011 ASCE Workshop of Computing in Civil Engineering, June 19-22, 2011, Miami, FL. (Accpted) See Paper

Lu, Y. and Cui, Q. (2011). “Corporate Sustainability Indicators: A Review and Framework for Construction Organizations”. International Conference on Sustainable Design and Construction (ICSDC), Kansas City, Missouri. March 23-25, 2011. See Presentation

Lu, Y., Cui, Q., Mao, L. and Chen L. (2011). “National-Level Infrastructure Risk Evaluation Framework and Best Practices”. 2011 ASCE International Conference on Vulnerability and Risk Analysis and Management (ICVRAM) and International Symposium on Uncertainty Modeling and Analysis (ISUMA) on uncertainty modeling and analysis. April 11-13, 2011; University of Maryland, USA

Hsu, S. and Cui, Q. (2011), “Project Complexity under Carbon Regulation and Trading,” Project Perspectives Journal, Vol. 33, pp.78-83. See Paper

Zhu, X., Whitten, L. and Cui, Q. (2011) “Green Performance Contracting on Highway Project”. 2nd international conference on transportation construction management. Feb. 7-10, 2011, Orlando, Florida. See Paper

Zhu, X., Ding, Q. and Cui, Q. (2011) “Design of Ad Hoc Network Transmission Mechanism for Greenhouse Gas Emission Inspection in Construction Projects”. 2011 ASCE Workshop of Computing in Civil Engineering. June 19-22, 2011, Miami, Florida. (Accepted). See Paper

Year 2010

Cui. Q., Zhu. X., Homar. B. and Sharma D. K. (2010) “Innovative Contracting Strategies for Combating Climate Change – Interim Report”. Report Prepared for Maryland State Highway Administration at the Center for Excellence in Project Management, University of Maryland.

Cui, Q. and Hsu, S. (2010), “Project Complexity under Carbon Regulation and Trading,” Proceeding of CIB World Congress, May 2010, Salford, United Kingdom, TG-62, pp. 1-15. (EI)

Cui. Q., Johnson. P., Sharma. D. K., and Bayraktar. M. (2010) “Determinants of Industry Acceptance For Highway Contracts”.  Vol. 16, No.1, Journal of Infrastructure System, ASCE. ISSN 1076-0342/2010/1-93-101. See Paper

Farajian, M. and Cui, Q. (2010). “Estimating Transaction Cost in Public-Private Partnerships”, 2010 AEC Innovation Conference, June 9-11,2010, State College, PA. See Paper

Farajian, M. (2010). “Estimating Transaction Cost in transportation Public-Private Partnerships in the US”, Master thesis, University of Maryland, College Park, MD.

Hsu, S. and Cui, Q. (2010), “A Decision Model for Technology Selection in Renovation Project Planning,” Proceedings of the 2010 Construction Research Congress, pp. 1234-1244. (EI) See Paper

Lu, Y., Zhu, X. and Cui, Q. (2010). “Analyzing the impact of construction industry under potential carbon regulation policies”. 4th Annual Trans-Atlantic INFRADAY Conference on Applied Infrastructure Modeling and Policy Analysis "Network Modeling and Infrastructure Policy for the Long- Term" Resources for the Future, Washington, DC (USA), 05 November, 2010 See Presentation

Sharma D. K., Cui Q., Chen L. and Lindly J. K. (2010). “Balancing Private And Public Interests In PPP Contracts Through Equity Capital Structure Optimization”. Vol 2151/2010, Pages 60-66, DOI 10.3141/2151-08, Transportation Research Record (TRR), Journal of the Transportation Research Board. See Paper

Zhu, X., Lu, Y. and Cui, Q. (2010). “Efficiency and Equity Implications of Carbon Tax in the Construction Industry”. Working Paper Proceedings. Engineering Project Organizations Conference (EPOC). Proceedings Editors: John E. Taylor, Paul Chinowsky, South Lake Tahoe, CA. November 4-7, 2010.

Before Year 2009

Sharma D. K. and Cui Q (2009). “Structuring Equity Investment in PPP Projects”. Engineering Project Organizations Conference, California. See Paper

Sharma D. K., and Cui Q (2008). “Big or Small, Does Warranty Contracting Warrant Equal Opportunity to All?” 1st International Conference on Transportation Construction Management at Orlando. See Paper


Links:    University of Maryland     Project Management Center for Excellence   
Contact:     cui@umd.edu
© 2011 Sustainable Infrastructure Group